Home page
Work
A8 Soliwald tunnel
The Soliwald tunnel is also to be equipped with an escape gallery. The construction work on an emergency exit in the middle of the tunnel was initiated in spring 2019. An approximately 200 metre long escape gallery will lead to an exit portal situated slightly to the south of the intersection between Anderdorfgasse and Brünigstrasse. The gallery is expected to be ready for use by the end of 2020.